U.S. flag

An official website of the United States government

icon-dot-gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

icon-https

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Shapefile outlining the Lake Mohave shoreline

Lake Mohave is one of several multi-purpose reservoirs that have been constructed on the Colorado River. The lake was formed upon completion of the Davis Dam in 1953. No mapping of the floor of the lake had been conducted since completion of the Davis Dam. The U.S. Geological Survey, in cooperation with researchers from the University of Nevada Las Vegas, completed a geophysical survey of this lake in April 2002. The survey included collection of sidescan sonar imagery of nearly the entire lake floor, and high-resolution seismic-reflection profiles along widely spaced lines throughout the lake. The detailed mapping of the lake floor was used to determine the amount of sediment that had accumulated in the lake since impoundment, its distribution, and the processes of deposition.

Get Data and Metadata
Author(s) David S. Foster, VeeAnn A. Cross
Publication Date 2005
Beginning Date of Data 2004
Ending Date of Data 2004
Data Contact
DOI This item doesn't have a registered DOI.
Citation Check repository for data citation.
Metadata Contact
Metadata Date 2024-03-18
Related Publication
Citations of these data No citations of these data are known at this time.
Access public
License http://www.usa.gov/publicdomain/label/1.0/
Loading...
Harvest Source: Coastal and Marine Geoscience Data System
Harvest Date: 2025-01-22T04:21:20.072Z